S2 Resources Ltd (“S2” or the “Company” advises that results have been received for the first eight reverse circulation (RC) holes and the first diamond hole drilled to follow up previous high grade gold mineralization at the Monsoon prospect. These holes, drilled on the first section and others close to the original high grade mineralized intercept of 66 metres @ 11.4g/t gold (uncut) in SPBC0313, did not intersect any material grades and widths of gold mineralisation.
Hope these results are not repeated with follow up drilling.
Helped S2R raise a bucket load of cash
GCY Price at posting:
34.0¢ Sentiment: None Disclosure: Held