Looks like they have thrown everything into the EIA, including the kitchen sink. Better to be safe than sorry. I am a little disappointed the financing letter of intent has been pushed out to 2H 2019, but this does align with the anticipated timing of the environmental approval - which makes perfect sense. I am very confident this project is going all the way. Another process box ticked. Now for the CEOL application. Patience required.
LPI Price at posting:
28.5¢ Sentiment: Buy Disclosure: Held