-
Share
28,706 Posts.
237
14/09/18
13:47
Share
page 3 says: Metal recovered to concentrate: Lead kt 1,011
due to the start up phase, the real ROM is 1.61 Mtpa
page 20 Table 9. China Pit Annual Physicals says Ore Processed Mt 20.9 over 13 years
20.9Mt divided by 13 years = 1.61 Mtpa
years 1, 2, 3 and 13 are below 1.8 Mtpa
all other years are 1.8mtpa max
Last edited by
ddzx:
14/09/18
-