KEY 0.00% 0.1¢ key petroleum limited

Ann: PGY: WA-481-P Update - 31 August 2018, page-2

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 15,831 Posts.
    lightbulb Created with Sketch. 216
    PILOT COMPLETES STAGE 1 OF WA‐481‐P INTERNAL RESOURCE ASSESSMENT
     Assessment focussed on Waitsia Gas Field analogues, oil prospects close to Cliff Head and
    Xanadu Oil Fields
     Also identified significant opportunities across the Permit in the Dongara, Wagina & High Cliff
    Sandstones
     Precursor to receipt of reprocessed 2D and 3D seismic
     Significant increase in prospective resources will be quantified based on reprocessed seismic
    Pilot Energy Limited (ASX: PGY) (“Pilot Energy”, or the “Company”) wishes to announce that it has
    completed stage 1 of an internal resource assessment of offshore exploration permit WA‐481‐P
    (the “Permit.
    The resource assessment is the first completed across the entire Permit which considers recent
    industry learnings in the Perth Basin. The Waitsia and Xanadu oil discoveries coupled with the
    resource extensions recently announced by Triangle Energy (Global) Ltd (ASX:TEG) in the vicinity
    of the Cliff Head Oil Field have been incorporated in the assessment.
    The review also identified significant potential in the Early Permian High Cliff Sandstone which
    directly underlies the Irwin River Coal Measures. This sandstone has exhibited excellent reservoir
    qualities where intersected but, to date, has not yielded significant hydrocarbons because wells
    drilled to this depth in the Permit have been outside mapped closure.
    Stage 2, which comprises preparing geological mapping to incorporate results of the 2D and 3D
    seismic reprocessing has now commenced. This stage will allow more accurate quantification of
    the assessed resources and independent resource assessment and certification.
    Additional information is included in the attached Permit Datasheet.
    Spokesman and CEO for Pilot Energy, Robert Gard, commented on the announcement:
    “We continue to be excited by the prospectivity of WA‐481‐P. Translating the Waitsia play
    into the Permit is a game changer which has the potential to generate sizeable
    prospectivity in shallow water close to shore. In addition to this, existing discoveries, which
    on a standalone basis have previously been assessed as sub‐economic, have the potential to
    combine both with nearby equivalent accumulations and deeper, High Cliff Sandstone
    prospects to justify cluster developments. Incorporating the reprocessed seismic into this
    assessment to quantify the discovered and prospective resources will now be our key focus
    in order to unlock the value of the Permit. ”
    Enquiries
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $2.262M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0
KEY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.