If you look at the drill intersection you will notice that the interval start from 14m and continues and still open to 360m. The interesting part is the first 14m is so enriched with super high grade Li that the company didn’t include it into the resource calculations or the Li grade average as It would have distorted the grade (which is quite interesting as it’s already the highest grade Li brine deposit in the world) - every other company would have sold this dream! This was a conservative approach. If you watch the TSI video the brine is at the surface so the first 14m would be the initial pay back period
LPI Price at posting:
29.0¢ Sentiment: Hold Disclosure: Held