-
Share
278 Posts.
73
09/08/18
12:13
Share
I think you need to factor into CAPEX into your assumptions.
EMR has a capex of $US98m while EAR has a capex of ~$A40m. EMR also has a lower IRR and higher risk given that the mine is based outside of Australia.
Cheers, GLTAH and DYOR
-