LTR 1.17% 84.5¢ liontown resources limited

Ann: Final assays expand Kathleen Valley lithium deposit, page-2

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 855 Posts.
    lightbulb Created with Sketch. 19
    Final assays expand Kathleen Valley lithium deposit ahead of maiden Resource Drilling extends strike and dip extent of high-grade mineralisation with all results to be included in a maiden Resource estimate scheduled for late August


    HIGHLIGHTS  Latest results include widest mineralised interval intersected to date at Kathleen’s Corner:  Other results include: (True widths 85-95% of down-hole widths listed above)  Continuous mineralisation at the main Kathleen’s Corner prospect has now been defined over a strike length of 1,100m and down-dip extent of 800m.  Mineralisation remains open both along strike and at depth.  Geological modelling indicates a total 19 mineralised pegmatites.  Maiden Resource estimate scheduled for completion by end of August 2018. Liontown Resources Limited (ASX: LTR) is pleased to advise that recently completed resource drilling has continued to expand the high-grade mineralisation at its 100%-owned Kathleen Valley Lithium Project, 680km north-east of Perth in WA, with work now underway on a maiden Resource estimate The latest results will be incorporated into a geological model of the mineralisation which independent mining consultants, Optiro Pty Ltd, will use to prepare the Resource estimate, scheduled for completion by the end of August 2018. o 39m @ 1.3% Li2O from 99m (KVRC0122), including:  6m @ 2.5% Li2O from 100m; and  5m @ 1.7% Li2O from 108m; and  5m @ 1.9% Li2O from 127m o 12m @ 1.8% Li2O from 113m (KVRC0123), including:  6m @ 2.5% Li2O from 118m o 16m @ 1.4% Li2O from 93m (KVRC0124), including:  6m @ 2.1% Li2O from 100m o 14m @ 1.6% Li2O from 38m (KVDD0006), including:  7m @ 1.9% Li2O from 43m o 12m @ 1.4% Li2O from 86m (KVRC0129), including:  6m @ 1.9% Li2O from 91m o 12m @ 1.2% Li2O from 175m (KVRC0131), including:  4m @ 2.1% Li2O from 175m o 9m @ 1.7% Li2O from 86m (KVRC0134), including  5m @ 2.3% Li2O from 88m


     Continuous mineralisation at the main Kathleen’s Corner prospect has now been defined over a strike length of 1,100m and down-dip extent of 800m.  Mineralisation remains open both along strike and at depth.  Geological modelling indicates a total 19 mineralised pegmatites.  Maiden Resource estimate scheduled for completion by end of August 2018. Liontown Resources Limited (ASX: LTR) is pleased to advise that recently completed resource drilling has continued to expand the high-grade mineralisation at its 100%-owned Kathleen Valley Lithium Project, 680km north-east of Perth in WA, with work now underway on a maiden Resource estimate The latest results will be incorporated into a geological model of the mineralisation which independent mining consultants, Optiro Pty Ltd, will use to prepare the Resource estimate, scheduled for completion by the end of August 2018.
 
watchlist Created with Sketch. Add LTR (ASX) to my watchlist
(20min delay)
Last
84.5¢
Change
-0.010(1.17%)
Mkt cap ! $1.612B
Open High Low Value Volume
85.0¢ 86.5¢ 83.5¢ $5.151M 6.083M

Buyers (Bids)

No. Vol. Price($)
2 23487 84.5¢
 

Sellers (Offers)

Price($) Vol. No.
85.0¢ 286512 4
View Market Depth
Last trade - 16.10pm 18/11/2024 (20 minute delay) ?
LTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.