CCE 2.50% 3.9¢ carnegie clean energy limited

Finding Nemos, page-59

  1. 11,120 Posts.
    lightbulb Created with Sketch. 108
    “The occasion, to be attended by several prominent figures from the industry and national politics, will also provide space for NEMOS and other companies to showcase demos and provide project updates, the organizers said.”

    https://mobile.marineenergy.biz/2018/07/26/ostend-tower-to-light-course-for-marine-energy-research/

    The most recent tank testing of a scaled down Ceto 6 was done using NEMOS power take off technology.

    The images of the test buoy, appeared to show that the PTO was externally mounted (out of the wave pool).

    Movement from the buoy was transferred to the PTO by cables and pulleys, (not dissimilar to how NEMOS’ floating device operates.

    As we know, Ceto 6 will have the PTO mounted inside the buoy.

    I am wondering if this test tower that NEMOS is building could be used to test a full size Ceto 6 in the same way as the scaled version in the wave pool?

    In doing this, CCE could deploy and assess how the buoy functions before moving to the next step using an on board PTO.

    In other words, a full scale version of the wave tank test.

    55CDA96F-9555-430D-AEBD-D9E039B07FDB.jpeg


    AFC99E34-238B-427D-B84F-644E27A96E9B.jpeg
 
watchlist Created with Sketch. Add CCE (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
-0.001(2.50%)
Mkt cap ! $13.91M
Open High Low Value Volume
4.0¢ 4.0¢ 3.9¢ $603 15.38K

Buyers (Bids)

No. Vol. Price($)
3 609486 3.9¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 6497 1
Last trade - 15.49pm 19/11/2024 (20 minute delay) ?
CCE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.