Well.
It does appear that anything may happen..
It might even be that some of the paperwork has been messed up.. tar mentioned that they thought 2 of the historical holes were switched over wrongly in terms of label vs downhole geology..
Other than that, the tar results are underreporting the cobalt figures..
I wish they would emphasise this more in the text of their reports rather than it be a hidden statement in the jorc section...
The heterogenite gets washed out during drilling.. meaning the real cobalt figures are probably much higher...
Noticed that their on surface grab samples with xrf were in the 1% 2% 3% zone...
Anyways.. i wonder if mwilu gives a positive surprise... its supposed to be all about shallow artisanal, but they drilled bunch of holes hundreds of metres deep.. so interested to see what comes out of that one
- Forums
- ASX - By Stock
- TAR
- Ann: High Grade Cobalt and Copper Results at Kamilombe Project
Ann: High Grade Cobalt and Copper Results at Kamilombe Project, page-38
-
- There are more pages in this discussion • 80 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add TAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.648M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 4134848 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 249009 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 2601223 | 0.008 |
13 | 3205738 | 0.007 |
11 | 1655817 | 0.006 |
4 | 3917980 | 0.005 |
6 | 3676292 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 883175 | 1 |
0.010 | 422125 | 4 |
0.011 | 309002 | 1 |
0.012 | 492825 | 1 |
0.013 | 795743 | 1 |
Last trade - 16.12pm 29/11/2024 (20 minute delay) ? |
TAR (ASX) Chart |
Day chart unavailable