Interesting to note that the Beryl farm will be using the new First Solar Series 6 panels (Kidston Stage 1 is Series 4 panels, I don't think Series 5 made it to production).
The Series 6 are larger, but most importantly designed to make handling and installation more efficient (cheaper). With the actual cost of panels now less than half the cost of building a solar farm, this could be a significant cost reducer, and I'd assume that Genex would stick with the same panel vendor for Stage 2.
GNX Price at posting:
28.5¢ Sentiment: Buy Disclosure: Held