That means assay results I think Which is needed for a resource upgrade but it's not a resource upgrade. It's infill drilling from the 2km extension at Klondyke, pre feasibility will require a resource upgrade so I personally don't see the point in doing it until near a pre feasibility is in development. In saying all of that... the infill drilling results is critical to the resource upgrade. It'll interesting to see the structure of the orebody as it continues on and from that we should have an idea of how many ounces we can add.
- Forums
- ASX - By Stock
- CAI
- Ann: June Quarter Cashflow Report
Ann: June Quarter Cashflow Report, page-9
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
CAI (ASX) Chart |
Day chart unavailable