COE 0.00% 17.0¢ cooper energy limited

Ann: Sole-3 flow-back completed successfully, page-17

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. Ya
    5,477 Posts.
    lightbulb Created with Sketch. 1040
    CA
    Sorry I am not sure about the decline rates here.

    It's a smallish field so they should b able to deplete it in a said timeframe. The missing piece of the puzzle was the actual flowrate from the wells when compared to the pre-flow modeling. Overall they need to flow 55-68 TJ/day to meet their GSA contract over 11 year life.

    During the Production test one generally shuts the well for number of hours to buildup pressure & then open it on daybreak to let her rip thro' the flareline (safety reasons). This 'shut-in/open' process is repeated over number of hours & on different Orifice settings. Their contractors keep a minute by minute Graph of pressure vs time on the rig pressure showing the Buildup & any Decline. Using this data they can project the reservoir's behavior over the life of the field.

    Noticed the flwrates of 38 to 48 MMcfd are on 1.375" & 1.625" choke settings with minimal sand flow & CO2 and pressure decline.

    Their plant capacity is 68 TJ/d, so 2 wells flowing at decent rates should b able to meet the reqd rate in my view. 68 TJ/d is apprx 64 MMcfd & 55 TJ/d is apprx 51 MMcfd flow. Multiply that by 365 days (or factor in 96% efficiency & 4% shut down for routine plant servicing/ maintenance etc). That should take care of 20 to 25 PJ/yr over 11 years. Hope this helps.
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
(20min delay)
Last
17.0¢
Change
0.000(0.00%)
Mkt cap ! $488.4M
Open High Low Value Volume
16.5¢ 17.0¢ 16.5¢ $173.7K 1.025M

Buyers (Bids)

No. Vol. Price($)
24 854516 16.5¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 51212 3
View Market Depth
Last trade - 16.10pm 11/11/2024 (20 minute delay) ?
COE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.