o The developed section at the southern end of the Stacpoole Zone returned low gold grades with further development ceasing o The southern portion of the Stacpoole Zone is more complex than first envisaged; this being a key learning from the approach to conduct trial mining first
Then a page or two down we have this beauty ,...
A total of 513 tonnes of material from the Stacpoole zone was processed through AuStar’s gravity gold processing plant. This material reported an upgrade of between 23% to 44% from the weighted average of face samples reported. However, the overall grades after processing were low, reporting within a range of 1.5 to 3.0 g/t Au, with no abnormal spikes assayed or visible gold recorded. Accordingly, all development work and processing of material recovered from that part of the southern end of the Stacpoole zone developed from Level 2 has ceased.
heading for .004 IMO, Following the charts trend !
AUL Price at posting:
0.7¢ Sentiment: Sell Disclosure: Not Held