Taruga have dropped multi references to past drilling and estimates. After doing some hunting it appears that KCC have done quite a bit of mining in drilling either on or next too TAR's tenement. It appears that KCC refer to this area as Mashamba East and actually have drilled this out to estimate tonnages..... so this is what I have pieced together so far...
This is TAR's Kamilombe tenement (yes its rough)….
This is what KCC used to refer to as Mashamba East
Note the outline of the pit....
Now based on KCC's Technical report found here....
http://www.katangamining.com/~/medi...tsoperational/technical-report-march-2017.pdf
This project has some Resource estimations...
So, this is going to make future TAR announcements very interesting IMHO. I wonder how much twining of holes has to be done before we can acknowledge KCC holes or resource estimations.
More work from me is required to work out exact positioning of the drill holes and resource outline. Not sure how much is available online.
- Forums
- ASX - By Stock
- TAR
- What would 78mt at 2% Copper and 0.6% cobalt be worth?
What would 78mt at 2% Copper and 0.6% cobalt be worth?
-
-
- There are more pages in this discussion • 101 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add TAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.648M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 4134848 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 249009 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 2601223 | 0.008 |
13 | 3205738 | 0.007 |
11 | 1655817 | 0.006 |
4 | 3917980 | 0.005 |
6 | 3676292 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 883175 | 1 |
0.010 | 422125 | 4 |
0.011 | 309002 | 1 |
0.012 | 492825 | 1 |
0.013 | 795743 | 1 |
Last trade - 16.12pm 29/11/2024 (20 minute delay) ? |
TAR (ASX) Chart |
Day chart unavailable