The drill hole is "vertical", just as the historic drill hole was vertical (90 degree dip)
Without width, the drill hole means little.
1 Note: A diamond drilling programme was carried out by KCC Katanga and Gecamines which ended in 2013 at the Kamilombe project. Diamond drilling is vertical and refers to down hole intersections, true width is not known at this stage.
Drill holes are vertical.
Historic drilling at the Kamilombe prospect was completed on a 200m x 200m grid with vertical drill holes.
All holes planned at Kamilombe are vertical. Drilling so far has shown this to be roughly perpendicular to the underlying stratigraphy. Holes at Kamilombe will be drilled at differing angles to ensure drilling is perpendicular to the stratigraphic orientation wherever possible where the mineralised units are interpreted to occur as two parallel synclines.
- Forums
- ASX - By Stock
- TAR
- Ann: DD Drilling Update
Ann: DD Drilling Update, page-5
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add TAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.648M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 5748549 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 139009 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 2601223 | 0.008 |
13 | 3205738 | 0.007 |
11 | 1655817 | 0.006 |
4 | 3917980 | 0.005 |
6 | 3676292 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 883175 | 1 |
0.010 | 422125 | 4 |
0.011 | 309002 | 1 |
0.012 | 492825 | 1 |
0.013 | 795743 | 1 |
Last trade - 07.00am 26/11/2024 (20 minute delay) ? |
TAR (ASX) Chart |
Day chart unavailable