@Scarpa great analysis. Thanks.
It is said on the anns. "Drill Pad TDH_P11 is being prepared by the excavator with an access track to move the rig to it from the current drill pad".
I can't see the drill pad TDH-011 but I can see TDH-011B on the Drill Plan. If it is the right one, that means they will move the rig to the far west of the prospect.
They also changed the drill pad from TDH-002 to TDH-004 after they drill the first hole TD-001 on drill pad TDH-001. The 2nd hole TDH-002 was drilled on the drill pd TDH-004 instead of THD-002.
We can understand that they are changing their drill plan depends on what they see on the cores.
View attachment 1075042
The interesting part with the drill pad THD-011b location where the 4th hole will be drilled, the lower grade lithium was found on that area and it was named as "White kaolinised Albite dominant Zone" See the graphic below.
That tells me that they now believe that they may find the main pegmatite right under that zone. That might be the main core zone which contains the spodumene. because the core zone is normally being under the albite zone.
I think they have got the idea from the silicified pegmatite zone they have found in the 2nd hole.
Time and drilling will tell. Fingers crossed...
View attachment 1075048