GPP 0.00% 0.1¢ greenpower energy limited

NT Fracking, page-16

  1. 4,285 Posts.
    lightbulb Created with Sketch. 718
    There is about 500TCF gas-in-place in the Beethaloo basin where mostly covered by origin Energy tenements (70% JV).

    6.6TCF gas is only the potential from the drilling of a few test wells. The gas potential will be a lot more than that when Origin starts drilling its tenements.

    "...Origin estimated there was a massive 496 trillion cubic feet (TCF) of gas. That equates to a massive 82bn barrels of oil potential . Now an awful lot of that has yet to be proven, but drilling and testing immediately prior to the fracking moratorium provided the basis for a resource od 6.6 TCF - which is still very much considered a ‘world class’ class project." (Source: Click here).

    gpp_tenements_org.jpg

    Lets' keep this in mind that GPP has got nothing to do with the gas potential on its tenements shown above. However GPP has mineral rights.

    The whole basin cross-section as below;

    cross-section south–north Beetaloo Basin.jpg


    The schematic representation graphic is as below;

    Schematic_1.jpg


    The shale gas which is in the interest of origin is placed in the primarily Valkerri and secondarily in Kyalla formations.

    Greenpower has two distinctly separate projects (targets) within the tenement application area which are both followed up by Alan Flavelle and of course by John Watts.

    The first, to which my above graphics apply, are the deep hypersaline brines (including the Kyalla and Valkerri formations) intersected during oil and gas exploration drilling. The hypersaline brine may have great lithium potential.

    The second, the Potassium-rich surface clays at Balmain Swamp (Lagoon), were found by Greenpower follow-up of NT Government radiometric imagery.
 
watchlist Created with Sketch. Add GPP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.