This is the parallel shear to the main Woodleys shear, where most of the resource is. The PFS used a mining width of 1.4m from memory. The ore sorter could make a huge difference here. Much of the dilution could be eliminated before it hits the crusher.
But yes, it’s a narrow vein deposit.