EUR 4.00% 2.6¢ european lithium limited

Ann: Project Update, page-36

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,706 Posts.
    lightbulb Created with Sketch. 50
    On this note, it is possible that promising drilling results from Zone II of the deposit, which haven’t been taken into account in the PFS, could support higher production rates over a longer mine life.

    Further drilling in Zone II was undertaken between January and March with all five holes drilled showing numerous pegmatite intersections.

    READ: European Lithium hits 10-metre intersection in Zone II, nearly double the widest intersection of Zone I

    Assay results are anticipated in mid-April following which a maiden resource in Zone II should be declared.

    The aim is to have increased measured and indicated resources for the DFS so that the project can be designed and evaluated at a mining rate of about 800,000 tonnes per annum.



    So results in mid April 18 will be key here. All in all, this is a very serious and positive evaluation of the EUR business future. Step by step, EUR moves to success. Waiting for a maiden resource report in Zone 11...................But not much longer. Looks like a slow but steady movement up in SP....
 
watchlist Created with Sketch. Add EUR (ASX) to my watchlist
(20min delay)
Last
2.6¢
Change
0.001(4.00%)
Mkt cap ! $57.32M
Open High Low Value Volume
2.5¢ 2.7¢ 2.5¢ $10.82K 412.1K

Buyers (Bids)

No. Vol. Price($)
1 24745 2.6¢
 

Sellers (Offers)

Price($) Vol. No.
2.7¢ 28571 1
View Market Depth
Last trade - 15.30pm 25/11/2024 (20 minute delay) ?
EUR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.