    Hi Shamish,

    Could you please apply for the below mentioned position and keep us informed of progress made with relevant completion dates.
    (I would imagine that commissioning of the Hub is about to start soon.)
    Thanks Shamish

    Position: Project Engineering Manager
    Location: Pagbilao LNG Terminal Hub, Philippines
    Start Date: mid April 2018
    Duration: 1 year + renewable 1 year
    Company: Siemens PSCD
    Need CVs by: March 2018
    Requirements:
    · Discipline: Process Control
    • 8-10 years experience in engineering management, consulting and/or project management for LNG greenfield projects, of minimum size EUR 10 mil.
    • Projects undertaken for major oil & gas / LNG customers must include Overall LNG Terminal Hub Emergency Shutdown System & Shutdown Matrix, as well as basic understanding of LNG terminal hub process control and operation
    • Previous Siemens Control System experience is preferred but not mandatory
    • Previous experience developing process concepts based on P&ID for System Integrator
    • Well-versed in English language especially in technical writing
    • Eligible to work in Malaysia and Philippines with minimal risks/constraints with regards to visa / permit applications
 
watchlist Created with Sketch. Add EWC (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $29.24M
Open High Low Value Volume
2.3¢ 2.3¢ 2.2¢ $2.31K 101.0K

Buyers (Bids)

No. Vol. Price($)
1 32067 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 5033577 1
View Market Depth
Last trade - 15.59pm 25/11/2024 (20 minute delay) ?
EWC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.