Yes very suspect that no spare capacity is available.. rule of thumb in every installation I’ve been involved with has at least 20% spare capacity. The wind farm one would think would have been constructed with at least some expansion intended.. it is what it is but and all will be revealed.
I can’t get my head around scrapping a perfectly good working CETO for the sake of a refund!
Sure, sort the refund out but keep the hardware to be put to good use. The amount of drawing board head banging going on at the moment am hoping any changes to this prototype as a result of test period will be easily done without the need to replace the whole unit... I mean I don’t expect these folks designing CETO to be that far off the mark.. hoping
- Forums
- ASX - By Stock
- CCE
- 7 news
7 news, page-13
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist