Someone needs a lesson in writing effective tweets. LOL What a mess.
In January 2018, The joint venture announced the PFS Expansion Case with a plant throughput of 4Mtpa with a Production Target utilising the Base Case Ore Reserve and additional production from existing Inferred, Measured and Indicated Mineral Resources.
NPV of USD 402million