With EGAO trading at intrinsic value, you get 36 trading days theta for free. The RC drilling should have resumed and be a week in.
Lots or RC (21+) and several DD holes due any day. First DD hole testing Clyde shears among them hopefully. RC drilling of Clyde and Miners should start very soon as well.
The Clyde DD, testing to 200m depth below intense historical workings could be very interesting. The first time a hole has been drilled at depth here. Shallow RC drilling in the south hit [email protected]/t from 42m a few months back, there is an historical 3m @17.4g/t form 5m hit to the North. Miners has returned 13.6g/t from almost surface (3m) as well.
These two shears have never been drilled at depth, although both have numerous old workings at surface.