Met isn't my strong point but I don't think anyone will find evidence for a process that costs anything near $1,200 to process one tonne of ore, which means the silver content (avg grade 2,100g/t) will well and truly pay for any costs of recovering and mining all of the gold and PGM content. Grade is King.
The pilot plant tests will provide some massive insights into the processing and recovery side of things as well as the metal content (recoverable grade ). I'm sure we'll be getting a big update soon now that the ASX crap is out of the way.
BBX Price at posting:
19.0¢ Sentiment: Buy Disclosure: Held