Positive is that VCN is still what it was 3-4 weeks ago
the company presentation states they still expec to proceed with mining in Early 2008 so minimal delay.
I have no doubt that they will be mining both deposits.
VCN has previously used these numbers:
US$1.50/lb copper, US$16/lb cobalt, US$5.55/lb nickel, US$0.77/lb zinc, US$550/oz gold.