Clock is ticking with 38m in the bank and the PFS showing a maximum drawdown of 35m. Hard to reconcile with Brilliant not being included as that could change the drawdown. 10m to refurbing the mill - things like the cat walks wouldn't cost much to replace, but if the guts are stuffed...well...Hard to know. On the flipside - you'd think that PGO would've just signed up to treat through Grrenfields if 3MH is a complete dead duck.
I'm cautiously optimistic. The lack of drilling in the quarterly can be interpreted two ways, but I see it as them having what they need. Brilliant is the key.
- Forums
- ASX - By Stock
- FML
- Ann: Coolgardie PFS Summary and Ore Reserve Upgrade
Ann: Coolgardie PFS Summary and Ore Reserve Upgrade, page-18
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add FML (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.0¢ |
Change
0.010(6.25%) |
Mkt cap ! $40.11M |
Open | High | Low | Value | Volume |
17.0¢ | 17.0¢ | 17.0¢ | $340 | 2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 11550 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 38500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 13612 | 0.270 |
1 | 114320 | 0.260 |
2 | 34882 | 0.250 |
1 | 3401 | 0.240 |
2 | 4600 | 0.230 |
Price($) | Vol. | No. |
---|---|---|
0.275 | 32000 | 1 |
0.280 | 58522 | 2 |
0.290 | 28948 | 1 |
0.300 | 13679 | 3 |
0.310 | 3229 | 1 |
Last trade - 13.39pm 15/11/2024 (20 minute delay) ? |
FML (ASX) Chart |