Interesting that the video says that the two existing reservoirs will be the upper and lower reservoirs, while all of the GNX documents I've seen say that a new "Turkey's Nest" dam will be constructed to be the upper reservoir:
http://www.genexpower.com.au/the-kidston-pumped-storage-hydro-project-250mw.html