DRILLING PROGRAMME
In September 2015 BBX commenced a 1400-meter drilling programme at Juma East. 6 holes JED 001-006 were
drilled in its initial six-hole drilling programme at Juma East, comprising three holes testing the interpreted breccia pipes at Plato (JED-001 to 003) and three holes testing the Guida low-sulphidation epithermal system (JED-004 to 006).
quote from
http://www.bbxminerals.com.au/projects/ema/
So you think all these web-site notes from the company are fictional and that drill rigs were not used?
Most investors know what drill rigs look like.If pics were provided, you would probably say they were faked also.
Your arguments are now more about self justification rather than a rational discussion.