MULTIPLE PEGMATITES INTERSECTED AT GASCOYNE LITHIUM PROJECT Segue Resources Limited (Segue or the Company) is pleased to provide an update on its maiden reverse circulation (RC) drill programme at the Reid Well lithium‐caesium‐tantalum (LCT) prospect at the 100% owned Gascoyne Lithium Project in Western Australia. The 2,500m RC drill programme was designed to test the lateral extent, depth and orientation of the 1.8km x 1.2km prospect (Figure 1). The first six (6) holes of the planned 17 hole programme have been completed with significant pegmatites intersected in several drill holes up to 35m thick. The intersections are consistent with the previously mapped and sampled surface outcrops and contain mineralisation indicative of LCT pegmatites.
- Forums
- ASX - By Stock
- AMD
- Ann: Multiple Pegmatites Intersected at Gascoyne Lithium Project
Ann: Multiple Pegmatites Intersected at Gascoyne Lithium Project, page-3
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AMD (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.37M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $16.61K | 8.307M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
221 | 560126302 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 205868761 | 45 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 219821 | 0.011 |
3 | 499221 | 0.010 |
5 | 1111319 | 0.009 |
2 | 800000 | 0.008 |
1 | 1000000 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 685238 | 2 |
0.014 | 616109 | 1 |
0.015 | 100000 | 1 |
0.016 | 76923 | 1 |
0.018 | 230500 | 3 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
AMD (ASX) Chart |