EBR 0.54% 92.5¢ ebr systems inc.

we have gas people, page-2

  1. 1,350 Posts.
    lightbulb Created with Sketch. 1
    VANESSA-1: PEL-182 COOPER BASIN S.A.
    Eagle Bay Resources advises that three drill stem tests have been run across the
    Epsilon and Toolachee Formations with the following results:

    DST #1A Epsilon Fm 29-7 Sand Test Interval 2977.1m ­ 2980m:
    Flowing Pressure 800 PSI on ½" Choke. Estimated Final Rate - Gas at 4.4 MMscfd
    Gas Composition: C1/C2/C3/C4/C5 86/11/2/1/tr Some CO2

    DST #1B Epsilon Fm 29-6 Sand Test Interval 2960.2m ­ 2693m:
    No flow after 15 min. Suspected tool malfunction.

    DST #1C Toolachee Fm 29-25 Sand Test Interval 2929.0m ­ 2931.8m:
    Flowing Pressure 525 PSI on ½" choke Estimated Final Rate - Gas at 2.8 MMscfd
    Gas Composition: C1/C2/C3/C4/C5 77/16/5/2/tr Some CO2. Logged sand
    thickness + 10 meters.

    Based on these results, production casing will be run and the well suspended pending
    completion as a possible gas producer at a later date.
    Current operations are attempting to pull out of the hole with the test tools.
 
watchlist Created with Sketch. Add EBR (ASX) to my watchlist
(20min delay)
Last
92.5¢
Change
0.005(0.54%)
Mkt cap ! $300.4M
Open High Low Value Volume
94.0¢ 94.0¢ 92.0¢ $46.39K 49.59K

Buyers (Bids)

No. Vol. Price($)
1 7830 92.5¢
 

Sellers (Offers)

Price($) Vol. No.
93.0¢ 944 1
Last trade - 12.31pm 22/11/2024 (20 minute delay) ?
EBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.