Hi @swimmingtoad I am well aware of how mechanical machines work due to my line of work I am involved in being an engineer/industrial electrical contractor, they go to fail safe mode and shut down until the issue rectified but if it has had issues as today I would have assumed that the ride would have been closed and fully inspected prior to reopening considering what has happened in the past 6 months and not opened within a very short period of time until completely inspected IMHO.
VRL Price at posting:
$3.79 Sentiment: None Disclosure: Not Held