6 months is a little optimistic i think. Scoping study should reveal all we need to know, works required, pond construction, production pumps install/commissioning, cash raise/finance, license required and application, and with any luck a timeline.
Sit tight we will know more soon but I'd be thinking along the lines of end 2017 all construction and pumps complete with possible first pond filled ready for 2018 first product. With any luck I'm way off and we see first product 2017.
- Forums
- ASX - By Stock
- APC
- Now who is the seller/buyer
Now who is the seller/buyer, page-38
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add APC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.070M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
APC (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online