www.juniorminingnetwork.com/junior-miner-news/press-releases/368-tsx-venture/cgp/27044-cornerstone-capital-resources-inc-cascabel-exploration-update-hole-18-intersecting-copper-mineralization-3-rigs-drilling-at-alpala-deposit.html0
- Drill Hole CSD-16-018 ("Hole 18"), is intersecting visible copper mineralization from 903.9m depth to current depth 1304.5m. Intensity of veining and copper mineralization is increasing with depth, as drilling continues towards a planned depth of 2300m into the rich lower portions of the Alpala Central deposit.
- Intense veining up to 45%.
- Access road to Alpala completed with vehicle access to Alpala Base Camp now fully operational and three drilling rigs operational.
AND still 1000m to go !!