I don't think so... 2.3mtpa of which In the short term (2017) Julius can only supply .5 tpa... The lease at bull's-eye is for 1m tpa... Plenty capacity left... Nothing to feed ...sl talk.... Show me the mine plans to feed the mill with ore to capacity for 2017 & 2018 ... It does not exist. This only works with all 3 feeding the beast.
All off the cuff so happy to be corrected.
Cheers,
Barry
MKO Price at posting:
9.4¢ Sentiment: Hold Disclosure: Held