AKK have started the Marco Polo #1 well - deviated drilling phase designed to intersect multiple fracture networks. There is no information on time line - those with the knowledge, any ideas on the time frame??
Week 46 Wrap: Copper hits 2mth low as Trump threatens net zero pace; US rally fades; HotCopper’s picks