Quite a nice little bunch of intersections there - although the dimensions and tonnage are modest at the moment, looking at the long section and cross section there is plenty of potential down plunge to be drilled. The upper 150-175m part of the deposit (which could be open-pittable) may add up to something like around 250,000 tonnes at say 2-2.5g/T and that's not counting anything further down plunge, lots of potential and room to fit a high grade south plunging shoot or two, obviously decent high grades but in narrow 3m wide zones may be more favourable to underground mining methods to maximise mining of ore and minimise mining of waste.
Its modest but a nice start!
MEP Price at posting:
6.5¢ Sentiment: Hold Disclosure: Held