Moussala project. ( P8 29/4/16 ) ‘Initial results from sampling are expected in late May to early June.’
“There has been limited modern day exploration completed within the project area and no drilling.
Results from two programs of soil sampling completed in 1997 by Ashanti Mali (492 samples on a
200m x 100m grid spacing) and 2011 by Africa Mining (249 samples on a 500m x 200m grid
spacing) delineated a number of gold-in-soil anomalies with a peak value of 542ppb gold
(equivalent to 0.542g/t Au).”
“Reconnaissance field work recently commenced on the project comprising mapping, sampling of
artisanal mining sites, soil geochemistry over previously untested target areas and infill soil
sampling over known gold-in-soil anomalies.
Initial results from sampling are expected in late May to early June”.
I have faith in the POG. ( Good as Gold )
I dont believe these Banksters can control the POG down for another 6 months and
when they lose control, IT IS GAME ON!
Any gold bugs or chart people should read the 1 minute article by James Turk
on King World News.
The graph he shows clearly explains the POG this year and clearly shows what
is about to happen to gold.
Even I can make predictions from this chart. King World News