PDZ 0.00% 26.0¢ prairie mining limited

$624 million rescue plan, page-3

  1. 5,276 Posts.
    lightbulb Created with Sketch. 19
    Mining: Jan Karski located


    Categories: Mining of Coal
    Type: Country
    Tags: Jan Karski pd what
    Created: Monday, 16 May 2016Author: BESource: Portal mining





    Prairie Mining Limited ended the last. year exploration of the deposit "Lublin" and prepared geological documentation has been approved by the Minister of the Environment

    632 million dollars is expected to cost a total construction in the municipality of Siedliszcze in the district Chelm mine Jan Karski. The investor company Prairie Mining Limited has completed work on the draft development of the deposit, which will be filed in the District Mining Office in Lublin.

    In connection with the decision on the location of the new mine which will be built near the village Kulik, an investor filed a motion to amend the local plan of spatial management Siedliszcze. To the Regional Environmental hit request for a decision on environmental conditions of investment with the card information of the project.

    - We continue intensive work on the preparation of the following documents necessary to apply for a production license for the mine Jan Karski. An important part of these preparations was to determine the location of our mines. We decided that the ground infrastructure will be built in near the village Kulik. Based on geological and mining conditions and economic analysis, we believe that this will be the optimal location - informs Benjamin Stoikovich, president of the Prairie.

    Field development plan will be the basis for an application for production license. The investor made a proposal to amend the study and the local plan of spatial management Siedliszcze. The proposed modifications are intended to permit the development of industrial areas currently classified as agricultural.

    To the Regional Directorate for Environmental Protection in Lublin already got request for a decision on environmental conditions with the card information of the project. On the basis of these documents, the investor will receive from RDOŚ scope of the report on the environmental impact. This in turn will be the basis for obtaining the environmental decision. The Company intends to prepare and submit a report in the third quarter of 2016., And hopes that the environmental decision obtains in 2017.

    Prairie Mining Limited ended the last. Year exploration of the deposit "Lublin" and prepared geological documentation has been approved by the Minister of the Environment. Thus, he received priority in applying for a production license. Documents required to obtain it plans to submit to the Ministry of the Environment in the first half of 2017.

    Recall that the total coal reserves in the deposit "Lublin" assessed in accordance with international standards (JORC) amount to 728 million tons, including in the category shown 352 million tonnes. The planned annual production of commercial coal will reach 6.3 million tons. The mine will be designed and built using international advanced technology, combined with a very favorable geological conditions in the Lublin Basin, will achieve the lowest cost of coal mining in Europe. With the creation of the mine will be created directly and indirectly 10 thousand. jobs - estimated investor.


    http://www.nettg.pl/news/135686/gornictwo-jan-karski-zlokalizowany
 
watchlist Created with Sketch. Add PDZ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.