From NST Jorc Table
'Northern Star has advised that results of work undertaken during the December 2015 Quarter are being used to plan further in-fill and extension auger geochemical drilling in the coming months as well as possible aircore/RC drilling traverses to test identified trends.'
From IGO Jorc Table
'IGO advises that additional work will be planned once the results are fully integrated with available geological and geophysical information.'
From the same report 27/1.
'IGO has advised that a review of all data relating to the diamond/RC drilling program undertaken at the Neptune Prospect has been completed. The drilling program was broad spaced (500m between sections) and the review has highlighted five target areas, comprising a combination of geochemical, geophysical and structural features that require follow-up drilling.'
So, I'd say nothing for a while on those 2 fronts. It will be a gradual accumulation period for me perhaps to be interrupted by an ann re an acquisition or farm-in/jv.
- Forums
- ASX - By Stock
- ALY
- Drilling Results
Drilling Results, page-35
-
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ALY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.068M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 10459854 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 766366 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 204000 | 0.013 |
6 | 1534407 | 0.012 |
3 | 1018000 | 0.011 |
4 | 1300000 | 0.010 |
1 | 100000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 431766 | 2 |
0.015 | 328000 | 2 |
0.016 | 492086 | 4 |
0.017 | 401126 | 3 |
0.019 | 196092 | 2 |
Last trade - 16.12pm 22/11/2024 (20 minute delay) ? |
ALY (ASX) Chart |
Day chart unavailable