settle settle.. doyle
they are drilling through extremely hard part of the rock formation. Once they drill through that, it should be a lot easier to drill through other parts.
have a look the second drill rig is here and we are only drilling up to 1020m which essentially meant we had to drill at least 280m more of rocks in the first well
I did have a chat with paul at the agm and yea they would love it for it to be finished now but you just have to be patient with the drilling. Thats why he made the decision to bring the 2nd drill rig in or else the 2nd well wont have been drilled in time. That was a very good call by him due to the geology and maybe drilling technology they have in china.
TNP Price at posting:
0.7¢ Sentiment: None Disclosure: Held