CMX 0.00% 3.7¢ chemx materials limited

cmx worth investigating, page-2

  1. 165 Posts.
    The company is well advanced in the detailed engineering design, is close to appointing a lead financier and has started purchasing the remaining surface rights.

    Construction is planned to commence in the 2nd half of 2006, with production following one year later.



    · At a milling rate of 2mpta, I expect Dinkidi can deliver an average of 220,000oz/pa gold equivalent (approximately 140,000oz/pa of gold and 13,000t/pa of copper) in the first 10 years. I anticipate cash costs to average US$216/oz equivalent, getting as low as US$172/oz equivalent. Total costs should average US$282/oz equivalent.

    · I value CMX at A$0.28/share using long-term copper and gold prices of US$0.88/lb and US$365/oz respectively and incorporating cost assumptions more conservative than CMX’s. Earnings in the first four years of production are expected to average A$20.7m/pa (4.2x PER) while peak earnings after tax should get closer to A$35m (2.5x PER).

    · The project is well leveraged to metal price assumptions. Each US$50/oz increase in the long term gold price adds A$0.11/share to the NPV while each US$0.25/lb increase in the copper price adds A$0.15/share. To illustrate this I note that at current spot prices CMX is valued at A$1.12/share and is trading at future earnings multiples of less than 1x.

    I believe that CMX is one of the best value plays in the sector, both in terms of valuation and earnings multiples.
 
watchlist Created with Sketch. Add CMX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.