I think wild optimism is one of the worst mistakes you can make. Re volume/production, you're not putting more than 1.2mt through a 1.2mt plant and they actually said tonnes mined/processed and yield drop after 10 years.
Sulphur credits; probably, cheaper port; not if demand is strong, contract mining; im ok with that.