The following is an excerpt from the SC44 presentation available on the GGX website. The paragraph refers to the Malolos well, we are up to point 5. But it's point 7 that really floats my boat. I'm assuming a similar timeframe to production would apply to the 3 wildcats too.
*****************
Phase 2 Workover Scheduled Q4 2011/2012 • Well cleaned out to 2,173 metres - obstruction • Main oil reservoir target cannot be accessed • Cased hole logging electric wireline completed • Flow test gas reservoirs identified by electric logs asap • Clear junk and flow test oil reservoir in mid-2012 • Convert gas into electricity for local sale • Oil sales within 6 months of establishing production
***********************