BGD 0.00% 26.5¢ barton gold holdings limited

gea conference in gladstone

  1. 499 Posts.
    At the Gladstone Engineering Alliance today Boulder Steel Mill Project Manager , Ross Johnson said:
    The EIS (due recently) has been held up for 6mths due to changes on Haul Routes allocation .
    Accordingly everything has gone back 6mths,
    New Guidelines are EIS -March 2012
    FID - 3Q 2012
    Start Construction -4Q 2012.
    Profitabilty improving every day with Refinement of Production Costs to Top 10 in the world .
    No date advised on Bankable Feasibility Study by Chinese.
 
watchlist Created with Sketch. Add BGD (ASX) to my watchlist
(20min delay)
Last
26.5¢
Change
0.000(0.00%)
Mkt cap ! $53.57M
Open High Low Value Volume
26.5¢ 26.5¢ 25.5¢ $14.54K 56.58K

Buyers (Bids)

No. Vol. Price($)
1 70000 25.5¢
 

Sellers (Offers)

Price($) Vol. No.
27.0¢ 4000 1
Last trade - 14.49pm 28/11/2024 (20 minute delay) ?
BGD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.