"A Programme of Work has been formulated and lodged with the Department of Mines and Petroleum, WA to seek authorisation of follow up RC drilling and a drilling contractor has been engaged and is scheduled to start in August 2011."
Scorp75, Quote is from Activity report 27 july 2011, page 1, paragraph 4, last time i looked at my calendar it was the 9th of September 2011, and no rig in site.
Loved the picture of the bloke eating the donuts, thumb up, We should start a threat with different photos of rodney leaving crispy creme stores..