TVN 13.2% 6.0¢ tivan limited

jorc?, page-2

  1. 4,962 Posts.
    lightbulb Created with Sketch. 6
    This drilling as I understand it is their due diligence drilling. Once they have paid for the asset in full which is a mere formality they will then drill a number of holes to give their primary JORC resource. That will coem later in the year. The wait for the JORC may well depend on how big an area they want to prove up. The initial JORC will probably only for a section of the project area andthen they will continually exoand on that.
 
watchlist Created with Sketch. Add TVN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.