-
Share
28,706 Posts.
237
17/07/11
14:16
Share
re: Ann: Razorback Magnetite Resource Doubles...
Let's stick to the facts.
In the Pilbara, FMG rail their iron ore 275km to port and BHP up to 400km to port
RHM just costed a 40km 1.75mtpa slurry pipe at $22m, although its capacity would probably be larger
ROY is extremely well position, requiring a 45km slurry pipeline or a 45m railway spur
Compare to:
SDL - 500km railway
GBG - 85km railway
FMG - 275km railway
-