FUT 0.00% 1.4¢ future corporation australia limited

buffet, page-10

  1. 6,361 Posts.
    I think the slowness of the drilling was that the boys on site like to have lots of smokos! Dont worry it should reach touchdown in around 6weekS! Catalougha lakes should also commence in around 6 years. I think the problem there is the captain of the barge is a heavy drinker and he cant get off the couch to put the rig in position. IT will happen though im sure!
 
watchlist Created with Sketch. Add FUT (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.