Splitupalip,
Toey also, but mainly concerned at the pace of the drilling considering it spud on the 5th and 12 days into the campaign TD is 287metres.They stated it was going to take 21 days to reach 750metres unless things speed up its going to take 27 days which will bring us into the new year. This might be a good thing (hope) because everything for Key in 2010 went to crap maybe 2011 everything may turn to gold (black gold).
- Forums
- ASX - By Stock
- KEY
- i hope the wp will fail. otherwise, ....
i hope the wp will fail. otherwise, ...., page-8
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $11 | 11K |
Featured News
KEY (ASX) Chart |