EVG 0.00% 3.1¢ evion group nl

mining tailings versus orebodies, page-9

  1. 23,765 Posts.
    lightbulb Created with Sketch. 258
    I spoke to BJ june last year still have the notes on what he said. he said power cost was to be $0.14 a Kwh. I think the bond mill index for the LL ore was around 40Kwh per ton but cant remember where I got that info from.
    anyway 40 * $0.14 = $5.60 per ton of ore milled

    The ore grades around 3.5 grams a ton from memory therefore cost per ounce is (31/3.5) * $5.6 * 90% recovery = power cost for commutation (grinding) = $55.00 per ounce.

    There was another company's mill I have notes on it was in either Kuator Kyrgystan ofr South Africa and retreating western limb tailings a 10,000 litre Isa mill 2.6 Mw (3600 horsepower) of power and milled 2m tonnes in 6 months at a cost of $4.00 a tonne to produce 19K ounces Platinum grading 2.2 grams a tonne
    4M tonnes * 2.2 gms a tonne = 8.8M gms per annum = 283K oz per annum.





 
watchlist Created with Sketch. Add EVG (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
0.000(0.00%)
Mkt cap ! $7.980M
Open High Low Value Volume
3.3¢ 3.3¢ 3.1¢ $3.403K 107.3K

Buyers (Bids)

No. Vol. Price($)
1 38595 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 40000 1
Last trade - 15.08pm 29/11/2024 (20 minute delay) ?
EVG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.